Is There a Specific Time Frame for Routine Maintenance on Roads?

AI Summary

Routine maintenance of roads in Havering follows a structured response system based on the risk level of defects. Here’s a breakdown of the timeframes for addressing different priorities:

Priority Level Risk Description Response Time
Priority 1 Very High risk - Imminent safety hazard 2 hours
Priority 2 High Risk - Urgent defects 24 hours
Priority 3 Medium Risk - Non-urgent safety defects 28 days
Priority 4 Low Risk - Non-urgent serviceability 28 days
Priority 5 Monitored for future maintenance As planned

Following these guidelines ensures that the most critical safety issues are addressed promptly. If you need to report a road defect or learn more about the maintenance process, you can do so through the Havering roads page.